AS 5092-2009

Click here to purchase
Specifies requirements for the design, construction, operation and maintenance of compressed natural gas (CNG) refuelling stations which can be one of the following: (a) fast fill, where vehicles are filled in a period of minutes, analogous to liquid refuelling; (b) time fill, where one or (in most cases) a number of vehicles are filled simultaneously over a period of some hours; or (c) a combination of fast fill and time fill.

Product Details

Edition:
1st
Published:
10/01/2009
ISBN(s):
073379260
Number of Pages:
36
File Size:
1 file , 550 KB
Product Code(s):
10148228, 10148272, 10148245