IEEE 1547.4-2011

Click here to purchase
New IEEE Standard – Active.Alternative approaches and good practices for the design, operation, and integration of distributed resource (DR) island systems with electric power systems (EPS) are provided. This includes the ability to separate from and reconnect to part of the area EPS while providing power to the islanded EPSs. This guide includes the DRs, interconnection systems, and participating EPSs.

Product Details

Published:
07/20/2011
ISBN(s):
9780738166889, 9780738166704, 9781504413305
Number of Pages:
50
File Size:
1 file , 1.5 MB
Product Code(s):
STD97119, STDPD97119, STDPL97119