API RP 92M

Click here to purchase
This document provides information for planning, installation, testing and operation of wells drilled with surface back-pressure managed pressure drilling (MPD). This document applies only to drilling rigs with surface blowout preventers (BOPs).

This document considers situations where the total drilling operation is performed balanced or overbalanced, including both hydrostatically overbalanced (no supplemental surface pressure needed to control inflow) and hydrostatically underbalanced (supplemental surface pressure needed to control inflow) systems.

This document does not cover MPD operations with subsea BOP stacks.

Product Details

Edition:
1st
Published:
09/01/2017
Number of Pages:
45
File Size:
1 file , 670 KB
Product Code(s):
G92M01, G92M01, G92M01
Note:
This product is unavailable in Cuba, Iran, North Korea, Syria