These methods of test are intended for determining the relation between moisture content and density of soil–cement mixtures when compacted before cement hydration. Appendix X1 provides commentary and protocols to characterize soil–cement mixtures that are susceptible to the effects of time delay between cement addition and compaction. Appendix X1 protocols are primarily intended for soil–cement mixtures having a maximum dry density, as determined in Section 9.3, lower than the maximum dry density of the same soil evaluated under the compaction prescribed in these methods without cement addition (i.e., soil and water only).
A 944-cm³ (1/30-ft³) mold and a 2.5-kg (5.5-lb) rammer dropped from a height of 305 mm (12 in.) are used and two methods, depending on soil gradation, are covered, as follows:
- Method A—Soil material passing a 4.75-mm (No. 4) sieve. This method shall be used when 100 percent of the soil sample passes the 4.75-mm (No. 4) sieve; or
- Method B—Soil material passing a 19.0-mm (3/4-in.) sieve. This method shall be used when part of the soil sample is retained on the 4.75-mm (No. 4) sieve.
This test method applies to soil–cement mixtures that have 30 percent or less retained on the 19.0-mm (3/4-in.) sieve, when Method B is used. The material retained on the 19.0-mm (3/4-in.) sieve shall be defined as oversized particles (coarse particles).
Product Details
- Published:
- 2022
- Number of Pages:
- 9
- File Size:
- 1 file , 450 KB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus