Click here to purchase
Covers both shop and site welding of joints in ferritic steel piping, and deals with preparation, procedure qualification and heat treatment of joints using the oxyacetylene process for Class 1 and Class 2 piping installations. Details of testing and inspection together with the method to be used for rectification of faulty welds are given.
Product Details
- Edition:
- 1st
- Published:
- 01/01/1970
- ISBN(s):
- 0726229687
- Number of Pages:
- 58
- File Size:
- 0 files
- Product Code(s):
- 10180003