BS PD CLC/TS 61400-26-2:2017

Click here to purchase
BS PD CLC/TS 61400-26-2:2017 provides a framework from which production-based performanceindicators of a WTGS (wind turbine generator system) can be derived. It unambiguouslydescribes how data is categorised and provides examples of how the data can be used toderive performance indicators.

The approach of this part of IEC 61400 is to expand the time allocation model, introduced inIEC TS 61400-26-1, with two additional layers for recording of the actual energy productionand potential energy production associated with the concurrent time allocation.

It is not the intention of this Technical Specification to define how production-basedavailability shall be calculated. Nor is it the intention to form the basis for power curveperformance measurements, which is the objective of IEC 61400-12.

Cross References:
CLC/TS 61400-26-1:2017
IEC TS 61400-26-1:2011
IEC 60050
IEC 61400-25-5:2006
IEEE 762:2006
IEC 61400-12-1:2005
IEC 61400-1:2005
IEC 61400-25-3:2006
IEC 61400-25-2:2006
IEC 61400-25-1:2006
IEC 61400-25-4:2008
IEC 61400-25-6:2010
EN 61400-25-4 (IEC 61400-25-4:2016)AS
EN 61400-25-6:2017
EN 61400-25-3 (IEC 61400-25-3:2015)AS
EN 61400-25-5 (IEC 61400-25-5:2006)AS
EN 61400-1 (IEC 61400-1:2005) AS
ISO 3977-9:1999
IEC 61400-12-2:2013
EN 61400-12-1:2017
EN 61400-12-2 (IEC 61400-12-2:2013) AS
EN 61400-25-1 (IEC 61400-25-1:2006)AS
EN 61400-25-2 (IEC 61400-25-2:2015)AS

All current amendments available at time of purchase are included with the purchase of this document.

Product Details

Published:
10/26/2017
ISBN(s):
9780580977329
Number of Pages:
51
File Size:
1 file , 1.2 MB
Product Code(s):
30357194, 30357194, 30357194
Note:
This product is unavailable in United Kingdom